CSI provides comprehensive maintenance and repair solutions for equipment supporting mission critical/life critical systems. We provide a high level of service support and expertise for uninterruptible power systems (UPS) precision computer room air conditioners, fire suppression systems, engine generators, power distribution, switchgear, and site monitoring equipment.
We provide a single point of service responsibility and accountability for computer\server rooms .
Services:
![]() |
CSI is committed to a high standard of service support.
|
Maxima
Our Comprehensive Service Plan (7X24)
** Preventative maintenance will be performed at customer's convenience,
seven days a week, 24 hrs. daily (excluding statutory holidays)
Prima
Our Preventative Service Plan (7X24)
** Preventative maintenance will be performed at customers convenience, seven days a week, 24 hours a day (excluding statutory holidays)
Air Conditioning Maintenance:Reliable operation of your computer room precision air conditioning system is vital to securing business operation through information technology systems. Our available service support is performed by experienced and factory certified technicians. The services are available on a 7 day 24 hour basis. The following are sample preventative maintenance check lists identifying the critical system checks. |
|
|
Room Integrity Testing Enclosures protected by gaseous fire suppression systems should tested for air-tightness upon commissioning of the system and annually thereafter. This is critical to ensure that the system will work effectively when activated; too much air-leakage will result in the concentration of the fire suppressant agent falling too quickly. Typical Preventative Maintenance for Waterless Suppression System Novec 1230 System – Semi-Annual Inspection Inspection will be performed in accordance with NFPA 2001, of the following, as applicable: 1. Check positioning of all nozzles. 2. Check for visible signs of deterioration. 3. Check all system hoses visually for damage. 4. Check agent quantity and pressure of all cylinders. 5. Check for shut down on all equipment. 6. Test operation of manual release. 7. Test operation of all automatic detector. 8. Test operation of remote manual release. 9. Clear all nozzles. 10. Re-seal all safety pins. 11. Re-seal all manual releases. 12. Re-activate systems - safety pins removed. 13. Insure personnel have been instructed on operation of system. 14. Document cylinder date and serial number. 15. Check Fire Alarm for proper Operation Including - Sequence of Operation - Actuation Devices - Alarm Devices - Delay Devices - Audible Devices - Visual Devices - Equipment Shutdown - Other related functions 16. Supply complete Inspection Reports and Comments. |
|
|
|
Engine Generators: Available in 5 Kva to 2000 Kva ratings. Available in Diesel, Natural Gas & Propane Fuel. CSI provides comprehensive engineering and installation services. We handle all aspects of the requirements including: site audits, conceptual layout plans, design drawings, project management, installation, and Ministry of Environment Approval Assistance.
We have supplied and installed engine generators manufactured by: Caterpillar, Onan-Cummins, Harper Detroit Diesel, and Kholer. EMERGENCY GENERATOR CHECKLIST |